Existing buildings & BIM · 2 min read
Which data do we deliver? Understanding IFC, Revit, DWG and point clouds
Choose deliverables around your software, intended use and agreed scope.
Technical contact & editorial responsibility: Sebastian Kisters · Updated: 5 November 2026
Which format does my design team need?
Short answer: It depends on software and task: E57 for survey points, DWG for drawings, IFC for open model exchange. Agree versions and a test import first.
Distinguishing model formats
IFC is an open, vendor-neutral standard for exchanging structured building models. Transferred elements and properties also depend on export, import and software support. RVT is Revit’s editable project format; agree the compatible version in advance. DWG can contain 2D drawings or 3D CAD geometry depending on the commission. A file extension alone therefore says little about actual content or suitability.
Preparing point clouds
E57 is used to exchange point cloud data. RCP and RCS form part of Autodesk workflows; the project file and prepared scan data need to be available together as required. Deliveries depend on agreed processing, not a universal format list. Consider large data volumes, spatial subdivisions and sharing with project partners. An early test import can reveal unclear requirements before full modelling starts and help confirm that the receiving workflow is usable.
Agreeing a verifiable handover
Define format, version, coordinate system, units and required accuracy together with element coverage, attributes, naming and acceptance. A sample file helps test exchange and editing expectations. Conversion can change properties, relationships or display; lossless transfer cannot be promised universally. Retain the agreed reference and handover record so later users understand the data’s origin and limits. Deliverable checks should examine content rather than only whether a file opens.
Practical checklist
- Specify receiving software and version.
- Agree coordinates, units and coverage.
- Arrange a sample import and acceptance criteria.
Limits & common mistakes
Compatible formats do not imply identical information. Conversion does not replace checking transferred content.
Sources & further reading
What does this mean for your building?
Let’s discuss objectives, data requirements and next steps.
