24 answers about surveys, data, design and collaboration – for building projects in Germany.

Technical contact & editorial responsibility: Sebastian Kisters · Updated: 5 November 2026

24 results

Building surveys

Which buildings are suitable for a 3D scan?

Residential, commercial and public buildings can be surveyed when relevant areas are safely accessible. Suitability depends on your objective, surface visibility and operating conditions. We discuss interiors, façades, roofs and plant areas in the initial conversation, including supplementary investigations. Scanning does not replace investigation of hidden elements or structural capacity.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
What should I prepare before a survey visit?

Existing drawings, a list of areas and details of access, occupancy and safety rules are useful. Arrange keys, escorting and sensitive rooms. Position movable objects as agreed so important surfaces remain visible. Scheduling considers operations and people; completely emptying every room is not automatically necessary. We clarify preparation for the actual scope.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
Can scanning take place in occupied or operating buildings?

Depending on use and building conditions, yes, but arrangements are necessary. Movement and changing occupancy can affect capture. Agree areas, access and appropriate windows together. Safety and sensitive information take priority. Whether interruptions or additional visits are required depends on the scope; this cannot be promised universally before reviewing the premises.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
How long do surveying and processing take?

Capture and processing are separate stages. Area, layout, access, occupancy and scanner positions affect site time. Registration, checks, drawing production and model detail determine subsequent work. Once these factors are known, a project-specific schedule can be discussed. We do not promise a fixed duration or universal delivery within one day.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
What accuracy makes sense for my project?

Required accuracy follows intended use: overview, design and detailed coordination have different needs. Agree measurement references, checks and acceptable deviations for the deliverables. Distinguish scanner specifications from the registered cloud and resulting model. A datasheet figure alone does not guarantee accuracy for every derived element or the complete survey workflow.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
Will hidden pipes, wall layers or damage be detected?

Laser scanning captures visible surfaces. Pipes behind linings, internal wall layers and load capacity do not become known automatically. Visible anomalies can be documented, but that is not a final diagnosis. Existing records and targeted investigation by suitable specialists may be needed. Keep missing information identifiable rather than treating inferred geometry as verified facts.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →

Models & data

What distinguishes a point cloud from a BIM model?

The cloud contains spatially located measurements and references visible existing conditions. BIM consists of deliberately modelled elements with agreed properties. Walls, rooms and equipment are structured and checked. Not every property is measurable, so assumptions must be marked. The useful deliverable depends on your subsequent application, rather than one format being universally better.

  • Record intended uses and element coverage.
  • Define attributes, assumptions and acceptance checks.
  • Retain the cloud as a traceable reference.
Related reading →
Which files and drawings will I receive?

Deliverables are agreed for each project. They may include point clouds, floor plans, sections and structured models in suitable formats. IFC, RVT, DWG, E57 and Autodesk cloud formats serve different purposes. Agree scope, version, units, coordinates and acceptance before work. Delivery of every format with identical content is not automatically included.

  • Specify receiving software and version.
  • Agree coordinates, units and coverage.
  • Arrange a sample import and acceptance criteria.
Related reading →
Can I use data in Revit, AutoCAD or other BIM software?

This depends on format, software version and required information. RVT needs a compatible Revit version; IFC provides open exchange but implementations can differ. DWG and clouds have their own import requirements. A sample or test import checks the intended workflow. Lossless conversion cannot be promised for every combination of applications and data.

  • Specify receiving software and version.
  • Agree coordinates, units and coverage.
  • Arrange a sample import and acceptance criteria.
Related reading →
How are detail level and model coverage agreed?

Scope follows your applications, such as room overview, system coordination or quantities. Agree elements, geometric detail, attributes and checks in writing. Identify unknown properties and inaccessible areas separately. Handover can then verify defined content instead of relying on an unclear expectation of a completely detailed building. More detail is not automatically more useful.

  • Record intended uses and element coverage.
  • Define attributes, assumptions and acceptance checks.
  • Retain the cloud as a traceable reference.
Related reading →
Can existing drawings and partial models be used?

Existing records can support surveying and modelling. Their origin, currency, scale, coordinates and editability matter. Agree which information acts as a reference and which needs checking against current measurements. Differences between drawings and reality should not be silently ignored. The appropriate integration is defined before processing so assumptions remain traceable to later users.

  • Record intended uses and element coverage.
  • Define attributes, assumptions and acceptance checks.
  • Retain the cloud as a traceable reference.
Related reading →
How are access rights and sensitive building data handled?

Models may contain sensitive rooms, systems and operational information. Authorised recipients, sharing, transfer routes and deletion arrangements are therefore agreed for the actual project. Explain special protection needs before capture. Storage location, transfer routes and any requirements for service providers are agreed in line with the protection needs. This gives you clarity before the project starts about who may use which building data.

  • Specify receiving software and version.
  • Agree coordinates, units and coverage.
  • Arrange a sample import and acceptance criteria.
Related reading →

Energy & design

Is a 3D scan enough for energy advice or a certificate?

No. Geometry supports area calculation, but construction layers, thermal properties, systems and use are also required. Scanning does not automatically analyse insulation or materials. Consumption records and construction information provide context. Energy advice and performance certificates are separate tasks for suitable professionals; the required inputs depend on purpose and method used in Germany.

  • Collect drawings, construction dates and renovation records.
  • Provide system details and dated consumption records.
  • Clarify advice objectives and professional qualification.
Related reading →
How do iSFP, energy certificates and specialist design differ?

The iSFP structures potential renovation steps for residential buildings in Germany. An energy certificate documents energy performance using the relevant method. Specialist design develops technical solutions for delivery. None automatically substitutes for the others. Funded advice and iSFP require qualified professionals and programme-specific conditions. These German references do not define rules in other countries.

  • Collect drawings, construction dates and renovation records.
  • Provide system details and dated consumption records.
  • Clarify advice objectives and professional qualification.
Related reading →
Can a heat pump work with radiators?

Radiators do not inherently rule out a heat pump. Room-by-room heat requirements and emitter output at proposed system temperatures are decisive. Hydraulics, hot water and controls need checking too. Underfloor heating is not essential. Specialist design based on building and system information determines whether changes are needed; geometry alone cannot answer that question.

  • Record radiator details and equipment nameplates.
  • Collect dated consumption and known temperatures.
  • Have location, neighbours and pipe routes assessed.
Related reading →
What additional data does PV design require?

Beyond roof geometry, assess shading, roof condition and structural suitability separately. Electricity demand or load profile, electrical infrastructure, metering and grid connection also matter. Evaluate storage according to its purpose. These inputs allow meaningful options; roof area alone is neither an installation design nor a yield guarantee. German grid requirements need project-specific coordination.

  • Check roof records, condition and structure separately.
  • Provide load profiles and electrical records.
  • Agree connection, metering and storage purpose.
Related reading →
Can PV, heat pumps, cooling and ventilation be planned together?

Shared data supports coordination of electricity demand, heat requirements, spatial interfaces and operating times. The technical disciplines remain separate specialist tasks. Cooling, for example, does not automatically provide fresh air. Agree which data and coordination services are needed and which professionals undertake sizing and checks. Joint information is useful, but does not erase professional responsibilities.

  • List occupancy schedules, people and equipment.
  • Record windows, shading and existing ventilation.
  • Have condensate, routes and maintenance access checked.
Related reading →
Are subsidies or savings guaranteed?

No. Funding depends on current programme conditions, qualifications, applications and the measure. Estimated savings rely on assumptions about building, use and operation; actual results can differ. Responsible German bodies and qualified professionals check relevant requirements. The quotation transparently delineates services, assumptions and the qualifications required in each case.

  • Collect drawings, construction dates and renovation records.
  • Provide system details and dated consumption records.
  • Clarify advice objectives and professional qualification.
Related reading →

Collaboration

What determines the cost?

Area, complexity, access, occupancy, accuracy, deliverables and coordination requirements matter. A cloud without modelling differs from detailed BIM with system information. The first conversation narrows the requirement and establishes a quotation basis. You receive a quotation tailored to the agreed scope with transparent services. Scope should be clear before comparing figures across different offers.

  • Confirm access, keys and safety requirements.
  • Agree occupancy, movable items and sensitive areas.
  • Specify deliverables and inaccessible spaces.
Related reading →
Can individual services be commissioned separately?

The first conversation can cover a single requirement or a connected package. Clarify interfaces, existing information and prerequisites. Whether a service can be offered and its scope follow the specific discussion and quotation. The quotation shows which services are included and which additional specialist services your project requires.

  • Align scope, exclusions and interfaces.
  • Specify checks and acceptance authority explicitly.
  • Record meters, periods, units and boundaries.
Related reading →
How do contractor quotes become comparable?

A common scope, quantity basis and clear interfaces help comparison. Assess prerequisite work, supplementary items, exclusions, existing-building risks and assumptions alongside totals. Query unclear items and document changes. Models clarify spatial questions but cannot replace a service specification. Explicitly agree which procurement and evaluation tasks are included rather than assuming comprehensive quote management.

  • Align scope, exclusions and interfaces.
  • Specify checks and acceptance authority explicitly.
  • Record meters, periods, units and boundaries.
Related reading →
What does site support include and what requires separate agreement?

Possible tasks include coordination, schedule tracking, documentation and agreed quality checks. Define actual scope and responsibilities in the commission. Full construction management, specialist evidence and legally binding acceptance authority are not automatic. Keep interfaces with designers and contractors clear to avoid assuming blanket responsibility for every construction activity or decision on site.

  • Align scope, exclusions and interfaces.
  • Specify checks and acceptance authority explicitly.
  • Record meters, periods, units and boundaries.
Related reading →
Which consumption data helps metering and ESG documentation?

Useful records identify meters, dates, periods, units and reading status, alongside use and weather context. Emission work requires data sources and boundaries; Scope 1 and Scope 2 cover different categories. Structured building data is not automatically a complete ESG report or certification. Agree documentation objectives for the project and retain the basis for later interpretation.

  • Align scope, exclusions and interfaces.
  • Specify checks and acceptance authority explicitly.
  • Record meters, periods, units and boundaries.
Related reading →
How do I start and what helps prepare a quote?

Provide building type, location, approximate area, objective and required outputs. Existing drawings, models, system records and a preferred timeframe help define scope. Use telephone, email or the local enquiry helper. It only prepares text; you send it yourself through your email app. Sensitive documents need not be shared unsolicited before appropriate arrangements are agreed.

  • Align scope, exclusions and interfaces.
  • Specify checks and acceptance authority explicitly.
  • Record meters, periods, units and boundaries.